To issue discharge work instructions on paper, N4 lets you print the following work instructions and discharge reports:
Discharge plans
Discharge sequence sheets
See Printing plans and reports for instructions. If your site uses Equipment Control to assign work instructions, see Issue discharge work instructions through EC.
Depending on the flexibility of your operations, your N4 administrator can configure the discharge plans and sequence sheets to print at various levels of position detail, such as slot, row, column, allocation range, or block.
Contact your N4 administrator, or see the manual Navis N4: Setup, Maintenance, and System Diagnostics Guide for more information about configuring your discharge reports.
There are several methods to complete the moves. You can complete the moves manually in the XPS client, or yard personnel can complete the moves with RDTs. Either way, N4 updates the final position in both the N4 client and the XPS client. See Completing planned moves (on page 1) for more information.